Solutions

Shore-Ends & Burial

Subsea Cable Shore-end Landing Operation
Diver-Assisted Shallow Water Cable Burial and Protection
Subsea Cable Stabilization and Burial at Shoreline

Shore-ends & Cable Burial – Shore-end and Cable Burial Solutions

GateMarine delivers Shore-end and Cable Burial solutions for subsea fiber optic and power cables, recognizing these activities as some of the most critical phases of subsea cable projects. Shore-end and shallow water areas are exposed to the highest environmental and third-party risks.

GateMarine’s approach focuses on protecting cables mechanically, ensuring stable positioning, and securing long-term system safety in these high-risk zones.

Engineering-Driven Shore-end Planning

Shore-end operations are planned based on desktop studies, survey data, and environmental conditions. Seabed characteristics, wave and current effects, marine traffic, and human activities are assessed during planning.

GateMarine defines project-specific cable routes, burial depths, and protection requirements to reduce operational risks during offshore execution.

Cable Burial Operations

Cable burial operations aim to place subsea cables safely below the seabed to protect them from external impacts. GateMarine plans burial solutions according to seabed soil conditions, water depth, and operational constraints.

These operations contribute to long-term cable stability and protection against fishing activities, vessel interaction, and environmental forces.

Protection and Stabilization in Shore-end Areas

Shore-end zones require additional stabilization due to wave action and shallow water dynamics. GateMarine applies appropriate protection and stabilization solutions to prevent cable movement and ensure controlled transition from shore to offshore sections.

These solutions ensure safe cable positioning and long-term protection under natural forces.

Integrated Approach in High-Risk Zones

Shore approaches and shallow waters represent the highest-risk areas for subsea cable systems. GateMarine integrates protection, burial, and marking solutions in these zones.

This integrated approach enhances both mechanical security and operational awareness.

Offshore Execution and Verification

Shore-end and cable burial works are executed in coordination with cable installation and protection activities. GateMarine applies controlled offshore procedures and verification steps to confirm final cable positioning and burial conditions.

These activities support project close-out documentation and long-term operation planning.